Taryn Rose

New Shoretel 12 foot Handset Receiver Curly Coil Cord IP Phone Black Long Lead

Description: NEW 12 Foot Replacement Handset Cord for Shoretel IP Phones - black color Compatible with Shoretel IP Phones: 110 115 210 230 230G 265 420 480 480G 485 565 560 530 560G 565G 655Cords & Lengths: As a telecom industry standard, the indicated lengths of handset cords are when they are fully stretched out, not when they are coiled in their packaging. Cords are rarely utilized at their full maximum stretched length, so it’s important to choose an appropriate length when buying. Available lengths for most cords are: 7 feet (11 inches coiled / unstretched) 9 feet (15 inches coiled / unstretched) 12 feet (22 inches coiled / unstretched) 25 feet (42 inches coiled / unstretched) If you have any questions at all regarding features, functionality, compatibility or condition of the equipment in this auction, please contact us.

Price: 7.99 USD

Location: Lexington, Kentucky

End Time: 2024-08-21T14:53:59.000Z

Shipping Cost: 0 USD

Product Images

New Shoretel 12 foot Handset Receiver Curly Coil Cord IP Phone Black Long Lead

Item Specifics

Restocking Fee: 20%

Return shipping will be paid by: Buyer

All returns accepted: Returns Accepted

Item must be returned within: 30 Days

Refund will be given as: Money Back

Country/Region of Manufacture: China

Type: Handset Cord

Features: Coil Cord

Cable Length: 12ft.

MPN: 230 115 265 565 560 530 210 110 480 655

Connector A: 4P4C (Handset Cord Connector)

Connector Type: 4P4C (Handset Cord Connector)

Brand: The VoIP Lounge

Recommended

USED 48V Power Supply Cisco IP 7900 Series IP Phone w/ power cord CP-PWR-CUBE-3
USED 48V Power Supply Cisco IP 7900 Series IP Phone w/ power cord CP-PWR-CUBE-3

$13.99

View Details
NEW 48V Power Supply for Polycom VVX Series IP Phone includes power cord
NEW 48V Power Supply for Polycom VVX Series IP Phone includes power cord

$23.99

View Details
NEW 48V Power Supply for Cisco 8941 & 8945 IP Phone w/ power cord CP-PWR-CUBE-3
NEW 48V Power Supply for Cisco 8941 & 8945 IP Phone w/ power cord CP-PWR-CUBE-3

$23.99

View Details
The VoIP Lounge Replacement 25 Foot Long Handset Receiver Curly Cord for Land...
The VoIP Lounge Replacement 25 Foot Long Handset Receiver Curly Cord for Land...

$17.01

View Details
New HD Voice Handset for Polycom VVX IP Phone Black (See Full Description Below)
New HD Voice Handset for Polycom VVX IP Phone Black (See Full Description Below)

$16.99

View Details
NEW 48V Power Supply for Cisco 7900 Series IP Phone w/ power cord CP-PWR-CUBE-3
NEW 48V Power Supply for Cisco 7900 Series IP Phone w/ power cord CP-PWR-CUBE-3

$23.99

View Details
10-Pack USED 48V Power Supply Cisco IP 7900 Series IP Phone CP-PWR-CUBE-3
10-Pack USED 48V Power Supply Cisco IP 7900 Series IP Phone CP-PWR-CUBE-3

$94.00

View Details
5-Pack NEW 48V Power Supply for Nortel Avaya IP Phone 1120E 1140E 1220 1230 1210
5-Pack NEW 48V Power Supply for Nortel Avaya IP Phone 1120E 1140E 1220 1230 1210

$119.00

View Details
The VoIP Lounge 25 Foot Long White Handset Curly Cord for Landline Phone
The VoIP Lounge 25 Foot Long White Handset Curly Cord for Landline Phone

$16.09

View Details
NEW 48V Power Supply for Cisco 8800 9900 IP Phone 9951 9971 8961 CP-PWR-CUBE-4
NEW 48V Power Supply for Cisco 8800 9900 IP Phone 9951 9971 8961 CP-PWR-CUBE-4

$34.99

View Details